Project Engineer
RECO Constructors, 2018 - Present
Tank and Pressure Vessel General Contractor
• Designing, testing, and implementing digitized cost estimation and project management tools contributing to a company-wide 15% overhead reduction
• Rapid prototyping tank and pressure vessel components or complete engineering document packages
• Engineering and managing multi-million dollar tank and pressure vessel installations and repairs performed to a variety of design codes and customer requirements
NASA Research Intern
University of South Florida, 2017 - 2018
American Public Research University
• Conducting hostile environment usability testing and 3D-printed iterations of the Geological Sample Extractor design allowing expansion into at least 2 additional markets including geographical anomaly analysis and infrastructure protection
• Analyzing kinematic data using SolidWorks, MATLAB, and Excel through funding awarded by NASA Florida Space Grant Consortium
Lead Draftsman/Junior Mechanical Engineer
Maintenance & Machinery Erectors, 2011 - 2018
Industrial Steel Fabrication
• Creating over 3,000 2D drawings, 3D models, walk-through videos, and photo-realistic renderings of proposed solutions and finalized designs for domestic and international management and shop fabrication
• Designing and pitching engineering solutions for clients by engaging their pain points, goals, and developing a deep knowledge of their current systems and processes
• Managing project progress through status meetings with subcontractors, site visits, production QC checks, and performance testing to ensure the project is delivered on time, within budget, and per design specifications
• Consulting internationally on Process & Instrument Diagrams (P&ID), converting complex 2D piping concepts into functional 3D models for documentation or domestic and international contractor consumption
• Developing client user manuals for the installation, proper use, maintenance, and troubleshooting of complex systems
• Developing technical drawings and manufacturing specifications that optimizes production efficiency while maintaining structural integrity, safety, and design goals
Fabricator
Barney's Pumps, 2007-2011
Industrial Pump Supplier
• Worked with a team of 5 fabricators to machine, weld, and construct pump/blower packages, wet-well pump brackets, and pump accessories for over 30 brands of pumps and blowers
• Guided engineering and sales teams on machining and construction feasibility and limitations to produce more efficient technical specifications and blueprints
• Prepared materials, packages, and parts for field installation including fitting, measuring, and cut line marking to ensure a seamless integration into clients’ existing systems contributing to over $27 million in average annual revenue
• Worked with a team of 5 mechanics to diagnose, repair, rebuild, and test faulty pumps/equipment reported by competitors’ clients increasing customer retention and securing 5 new client accounts from competitors
Welder
Universal Studios Orlando, 2006-2007
Theme park catering to over 20,000 guests daily
•Created new guest experiences by repairing, proposing, and fabricating theme park ride components per AWS code, ensured patron safety, and reduced maintenance costs as well as habitual breakdowns by 4%